Section 23 36 00 Air Terminal Units: checking VAV box submittals tag by tag

How to review VAV and fan-powered box submittals: minimum airflow the sensor can control, inlet static, sound, reheat coils and controls.

Illustration: a VAV box submittal where the scheduled minimum airflow is below the lowest airflow the box’s flow sensor can control, while maximum airflow and sound match and heating leaving air temperature is not stated.

Illustrative example

The short answer

Section 23 36 00 covers air terminal units such as single-duct VAV boxes, fan-powered boxes and dual-duct units. Review each tag for maximum and minimum airflow against the inlet size the sensor can control, minimum inlet static pressure, discharge and radiated sound at the scheduled conditions, reheat coil or electric heat performance, casing liner, and who supplies and mounts the controls.

MasterFormat division
23, HVAC
Rating standard
AHRI 880 for rating; AHRI 885 for estimating room sound
Volume
Often dozens to hundreds of tags on one submittal
Coordinate with
23 09 23 controls, 23 21 13 hot water, Division 26 power for electric heat

What Section 23 36 00 covers

Terminal units sit between the duct main and the room and set how much air each zone gets. The submittal is usually one long schedule with a row per tag plus product data, sound data and reheat coil printouts. Because there are so many tags, errors repeat: one wrong assumption about minimum airflow or inlet static is copied down a hundred rows.

Terminal unit types
TypeHow it worksExtra things to check
Single-duct VAV, cooling onlyDamper varies primary airMinimum airflow, sound
Single-duct VAV with reheatDamper plus hot water or electric coilCoil capacity, leaving air temperature
Series fan-poweredFan runs whenever the zone is occupiedFan airflow at least the primary maximum, fan motor data
Parallel fan-poweredFan runs in heating to mix plenum airFan airflow, backdraft damper
Dual ductHot and cold decks mixed at the boxTwo inlets, mixing, two flow sensors

Minimum airflow and what the sensor can control

A VAV box measures airflow with a velocity pressure sensor in its inlet. Below a certain inlet velocity the signal is too small for the controller to measure reliably. Manufacturers publish a minimum controllable airflow for each inlet size, and many specs set a minimum inlet velocity. The scheduled minimum must be at or above it, or the box cannot hold the minimum the engineer designed for ventilation and heating.

Worked example: can a 10 in. box hold 150 CFM?
Inlet area, 10 in. round
π × (5 ÷ 12)² = 0.545 sq ft
Minimum controllable velocity (manufacturer)
400 FPM
Minimum controllable airflow
0.545 × 400 = 218 CFM
Scheduled minimum
150 CFM
An 8 in. inlet at 400 FPM
0.349 × 400 = 140 CFM, and 900 CFM max is 2,580 FPM

Downsizing fixes the minimum but raises velocity and noise at maximum airflow. That trade-off is the engineer’s; the submittal’s job is to show it.

Energy codes also limit how much air may be reheated. ASHRAE 90.1 restricts simultaneous heating and cooling at VAV boxes, which is why many sequences use a low cooling minimum and a higher heating maximum, often called dual-maximum control. Check the submittal schedule carries both airflows when the sequence needs them.

Inlet static pressure and sound

  • Minimum inlet static pressure is the pressure the box needs at maximum airflow to pass that airflow with the damper fully open. It feeds the air handler’s duct static setpoint. A box needing 0.6 in. wg where the design assumed 0.25 in. wg raises fan energy for the whole system.
  • Sound is reported as discharge sound (through the duct) and radiated sound (through the casing into the ceiling). AHRI 880 rates sound power; AHRI 885 gives a method to estimate the NC in the room. Check the submittal’s NC values are at the scheduled inlet static and airflow, not at a lower pressure.
  • Sound attenuators and lined discharge plenums change both numbers; if the drawings show them, the sound data should include them.

Reheat coils and electric heat

Heating values to check
ValueWhy it matters
Heating airflowCoil output depends on the airflow in heating, which may differ from the cooling minimum
Hot water flow, entering temperature and rowsMust match the boiler plant temperatures, often lower with condensing boilers
Leaving air temperatureUnder ASHRAE 62.1, warm air supplied from the ceiling at 15 °F or more above room temperature lowers ventilation effectiveness
Water and air pressure dropFeeds pump head and box static pressure
Electric heat kW, steps or SCR, voltage and phaseMust match the panel schedule; see voltage mismatches
Electric heat safetiesAirflow switch and limits, required by the listing

Controls, casing and liner

  • Controls: most boxes ship with the building automation controller mounted by the box manufacturer but furnished by the controls contractor. The submittal must say who furnishes, who mounts, and who wires the transformer.
  • Liner: fiberglass liner is common, but hospitals and labs often require foil-faced, closed-cell or solid metal liners. Check the spec for the occupancy.
  • Casing leakage at the rated pressure, access doors on the coil side, and hanger locations for the weight.
  • Hand of connections: the side the controls and coil connections are on must match the ceiling layout.

Why terminal unit submittals are returned

Common rejection reasons
ReasonHow to avoid it
Minimum airflow below controllable airflowCheck every tag’s minimum against its inlet size
Sound shown at a lower inlet static than designSelect sound at the scheduled inlet static
Reheat coils selected at the wrong water temperatureUse the plant’s design hot water temperatures
Heating airflow not scheduledInclude both airflows for dual-maximum sequences
Liner not suitable for the occupancyMatch the liner to the spec for healthcare and labs
Controls responsibility unclearState furnish, mount and wire for each component

Where Cailar fits

What Cailar does

  • Reads airflow, static pressure, coil and electrical values for each tag and compares them with the schedule, converting CFM and in. wg in code.
  • Flags any tag whose submitted value conflicts with its schedule row, or has no value, with the page cited, so repeated errors across many rows are visible at once.

What stays with your reviewer

  • Calculate minimum controllable airflow, room NC or ventilation effectiveness.
  • Select terminal units or reheat coils.

Questions and answers

What does Section 23 36 00 cover?

Air terminal units: single-duct VAV boxes with or without reheat, series and parallel fan-powered boxes, dual-duct units and similar devices that control airflow to each zone.

What is minimum controllable airflow on a VAV box?

It is the lowest airflow the box’s inlet flow sensor and controller can measure and hold reliably. It is set by inlet size and a minimum inlet velocity. A scheduled minimum below it cannot be maintained.

What is minimum inlet static pressure?

The static pressure the box needs at its inlet to pass maximum airflow with the damper wide open. The duct system and the air handler’s static pressure setpoint must provide at least that at every box.

What is the difference between AHRI 880 and AHRI 885?

AHRI 880 is the rating standard for air terminal performance and sound power. AHRI 885 is a procedure for estimating the sound level in the occupied room from that sound power, using typical ceiling and duct attenuation.

Why does reheat leaving air temperature matter?

ASHRAE 62.1 lowers the zone air distribution effectiveness when warm air is supplied from the ceiling at 15 °F or more above room temperature, which raises the outdoor air needed. Many designs cap leaving air temperature for that reason.

Sources

Standards and codes this page relies on. Check the edition your project and jurisdiction have adopted.