Section 23 64 16 Centrifugal Water Chillers: capacity, kW per ton and IPLV on the submittal
Reviewing a centrifugal chiller submittal: capacity at design water temperatures, kW per ton, IPLV or NPLV, fouling factors, pressure drops and starter.
Illustrative example
The short answer
Section 23 64 16 covers water-cooled centrifugal chillers. Check that the selection printout uses the scheduled chilled and condenser water temperatures, flows and fouling factors; that full-load kW per ton and IPLV or NPLV meet the spec and the energy code path; that pressure drops fit the pump selections; and that the starter, electrical data, refrigerant, water box ratings and factory test match the spec.
- MasterFormat division
- 23, HVAC
- Rating standard
- AHRI 550/590 (I-P)
- Efficiency terms
- kW per ton at full load, IPLV at standard conditions, NPLV at design
- Coordinate with
- 23 21 23 pumps, 23 65 00 towers, 26 29 23 or unit-mounted drive, ASHRAE 15 machinery room
What Section 23 64 16 covers
Centrifugal chillers are the largest single piece of equipment on most central plants, and usually the longest lead time. Section 23 64 16 covers water-cooled centrifugal machines with fixed or variable speed compressors; screw chillers are in 23 64 26 and scroll chillers in 23 64 23. The submittal is built around a selection printout from the manufacturer’s rating software, and nearly every review question is answered on it.
Read the selection printout first
| Value | Requirement from | Common problem |
|---|---|---|
| Capacity in tons | Chiller schedule | Rounded up, or at different water temperatures |
| Evaporator leaving and entering water temperatures | Schedule | Selected at a 10 °F range where the schedule says 12 °F |
| Evaporator flow in GPM | Schedule and pump schedule | Flow does not match the primary pump |
| Condenser entering and leaving water temperatures | Schedule | 85 °F entering assumed where the tower is designed for 87 °F |
| Fouling factors | Spec | Selected at a lower fouling factor than specified |
| Full-load kW per ton | Spec, energy code | Measured at a different capacity or condenser temperature |
| IPLV or NPLV | Spec, energy code | IPLV given where the spec asks for NPLV at design conditions |
| Evaporator and condenser pressure drop | Spec, pump head | Above the spec maximum, so pumps are short of head |
| Passes and water box arrangement | Spec, piping layout | Connections on the wrong end for the mechanical room |
| Refrigerant and charge | Spec | Different refrigerant than specified |
Fouling factor is the allowance for scale and dirt on the tubes. AHRI 550/590 standard conditions use 0.0001 h·ft²·°F/Btu on the evaporator and 0.00025 on the condenser. A printout selected at a cleaner value shows better capacity and efficiency than the machine will deliver after a few years. If the spec states fouling factors, the printout must use them.
kW per ton, IPLV and NPLV
Full-load efficiency is the power drawn per ton at 100 percent capacity. IPLV, the integrated part load value, weights efficiency at 100, 75, 50 and 25 percent load at AHRI standard conditions. NPLV is the same calculation at the project’s own design conditions. ASHRAE 90.1 sets minimums for both full load and IPLV, with two compliance paths: Path A for machines that run mostly near full load, Path B for machines that run mostly at part load, usually variable speed.
- Capacity
- 500 tons
- Full-load efficiency
- 0.548 kW/ton
- Compressor input at full load
- 500 × 0.548 = 274 kW
- COP = 3.517 ÷ kW per ton
- 3.517 ÷ 0.548 = 6.42
- Same machine at 0.580 kW/ton
- 290 kW, 16 kW more at every full-load hour
One ton is 12,000 Btu/h or 3.517 kW of cooling, which is why COP equals 3.517 divided by kW per ton.
Starter, drive and electrical data
- Starter type: unit-mounted variable-speed drive, solid-state starter or electromechanical starter. Each has different inrush, footprint and harmonic behavior; the spec chooses.
- Harmonics: a unit-mounted drive may need a harmonic filter to meet the IEEE 519 limits the spec cites. The submittal should state the expected distortion at the point the spec names.
- Voltage: large centrifugal chillers may run at 460 V or at medium voltage such as 4,160 V. The voltage must match the one-line diagram; see voltage mismatches.
- MCA, MOP and the short-circuit current rating of the starter or drive must suit the feeder and the available fault current at the chiller. See MCA and MOP.
Water boxes, refrigerant and testing
- Water box working pressure, commonly 150 psig, must meet the system pressure at the chiller, which can be higher in tall buildings.
- Marine water boxes let tubes be cleaned without disconnecting piping; compact boxes do not. The spec usually decides.
- Tube wall thickness and material: thicker or cupronickel tubes for aggressive condenser water.
- Refrigerant: low-pressure refrigerants such as R-1233zd(E) and medium-pressure ones such as R-134a or R-513A need different machinery room provisions under ASHRAE 15. Refrigerant monitors, alarms and ventilation are often in another section; confirm they match the refrigerant submitted.
- Factory performance test: many specs require a test to AHRI 550/590 procedures, sometimes witnessed. The submittal should state the test, the test points and the tolerance.
Why chiller submittals are returned
| Reason | How to avoid it |
|---|---|
| Selection at different water temperatures | Copy the schedule’s temperatures and flows into the selection |
| Fouling factor lower than specified | Rerun the selection at the specified values |
| IPLV where NPLV was required | Report the value the spec and code path ask for |
| Pressure drop above the spec maximum | Change passes or tube count before submitting |
| Starter or harmonic data missing | Include the drive data and the harmonic analysis the spec requires |
| Water box rating below system pressure | Check the pressure at the chiller elevation |
Where Cailar fits
What Cailar does
- Reads capacity, efficiency, flows, pressure drops and electrical data from the selection printout and compares them with the schedule and spec, converting tons, kW, GPM, feet of head and psi in code.
- Flags a value that misses the requirement, such as a pressure drop above the maximum, and marks values the printout does not state.
What stays with your reviewer
- Rerun the manufacturer’s selection or calculate IPLV or NPLV.
- Choose the energy code compliance path. The engineer of record does.
Questions and answers
What is the difference between IPLV and NPLV?
Both weight chiller efficiency at 100, 75, 50 and 25 percent load under AHRI 550/590. IPLV uses AHRI standard rating conditions; NPLV uses the project’s own design conditions, such as a different condenser water temperature.
How do I convert kW per ton to COP?
Divide 3.517 by the kW per ton. One ton of cooling equals 3.517 kW, so a chiller at 0.548 kW per ton has a COP of about 6.42.
What fouling factor should a chiller be selected at?
The one the specification states. AHRI 550/590 standard conditions use 0.0001 h·ft²·°F/Btu for the evaporator and 0.00025 for the condenser. A selection at a cleaner value overstates capacity and efficiency.
What are Path A and Path B in ASHRAE 90.1?
They are two sets of minimum chiller efficiencies. Path A emphasizes full-load efficiency for machines that run mostly near full load; Path B emphasizes part-load efficiency, typical of variable-speed machines. A chiller must meet both the full-load and IPLV values of the path used.
Are screw chillers covered by 23 64 16?
No. Section 23 64 16 is for centrifugal chillers. Rotary-screw water chillers are in 23 64 26 and scroll water chillers in 23 64 23.
Sources
Standards and codes this page relies on. Check the edition your project and jurisdiction have adopted.
- AHRI Standard 550/590 (I-P), Performance Rating of Water-chilling and Heat Pump Water-heating Packages
- ASHRAE Standard 90.1, water chilling package minimum efficiency tables
- ASHRAE Standard 15, Safety Standard for Refrigeration Systems
- IEEE 519, harmonic control in electric power systems