Section 23 74 16.13 Packaged Rooftop Air-Conditioning Units: reviewing an RTU submittal
How to review a rooftop unit submittal: capacity at the project’s design conditions, IEER, fan static, economizer, refrigerant, curb and electrical data.
Illustrative example
The short answer
Section 23 74 16.13 covers large packaged rooftop units. A complete RTU submittal shows cooling capacity at the project’s design ambient and entering air conditions rather than only the AHRI rating point, efficiency in EER and IEER, supply airflow at the scheduled external static pressure, the heating section, economizer and outside air controls, refrigerant, curb, weight and electrical data for the voltage supplied.
- MasterFormat division
- 23, HVAC
- Rating standard
- AHRI 340/360 for 65,000 Btu/h and larger
- Rating point
- 95 °F outdoor, 80 °F dry bulb and 67 °F wet bulb entering
- Coordinate with
- Structural curb and framing, Division 26 power, 23 09 23 controls
What the section covers
Packaged rooftop units combine the compressor, condenser, evaporator, supply fan and heating section in one cabinet set on a roof curb. MasterSpec splits them into small-capacity units in 23 74 16.11 and large-capacity units in 23 74 16.13, with the cutoff defined in the section. Dedicated outdoor air units and custom air handlers are elsewhere in Division 23, so check the section number on the cover before reviewing anything else.
The schedule on the mechanical drawings carries most of the requirements: capacity at stated conditions, airflow and external static pressure, outside air, heating input or kW, efficiency, electrical data, weight and options. The section adds construction, controls, warranties and testing.
Capacity at the project’s conditions, not the rating point
AHRI 340/360 ratings are measured at 95 °F outdoor air and 80 °F dry bulb, 67 °F wet bulb entering air. A unit installed in Phoenix, Las Vegas or Dallas sees a hotter design day, and a unit with a lot of outside air sees warmer, wetter entering air. Capacity at those conditions can be several percent lower. The schedule should state its conditions; the submittal must show a performance printout at them.
- AHRI rated total capacity at 95 °F
- 362 MBH
- Scheduled design ambient
- 105 °F
- Scheduled total capacity at design
- 345 MBH
- Submitted capacity at 105 °F (performance printout)
- 334 MBH
- Shortfall
- 11 MBH, about 3 percent
- Sensible capacity
- Check separately: latent-heavy loads hide sensible shortfalls
If the rep only included the AHRI certificate, the shortfall is invisible. Ask for the selection printout at the scheduled ambient and entering air conditions.
Values to check on every RTU
| Value | Source of the requirement | Common problem |
|---|---|---|
| Total and sensible cooling | Schedule | Only rated capacity shown; sensible not stated |
| Supply airflow and external static pressure | Schedule | Airflow shown at a lower static pressure than scheduled |
| Outside air and economizer | Schedule, energy code | No economizer where the code requires one, or no fault detection |
| EER and IEER | Energy code, spec | Efficiency from a different size or voltage |
| Heating input, output or kW | Schedule | Gas output given where input was scheduled, or the reverse |
| Heat exchanger material | Spec | Aluminized steel where stainless is required |
| Refrigerant | Spec | R-410A or R-454B against the specified refrigerant |
| Filters | Spec | Two-inch MERV 8 where MERV 13 is required |
| Curb | Spec, structural | Curb height, wind or seismic rating, or adapter for an existing curb missing |
| Operating weight | Structural | Weight with options and curb not given |
| Electrical data | Schedule, panel schedule | Data for another voltage; see voltage mismatches |
| MCA, MOP and disconnect | Panel schedule | Breaker above MOP; see MCA and MOP |
| Controls interface | 23 09 23 | No BACnet interface where the building automation system needs one |
| Convenience outlet | Spec | Unit-powered outlet where field-powered is required, or none |
Economizers and outside air
ASHRAE 90.1 and the IECC require air economizers on cooling systems above a size threshold in most climate zones, and newer editions require fault detection and diagnostics on economizers so a stuck damper is reported. California Title 24 has its own requirements. The spec usually states the control sequence, the type of high-limit control and whether fault detection is required.
- Check the minimum outside air setting against the ventilation schedule, in CFM.
- Check the high-limit control type the spec names: fixed dry bulb, differential dry bulb or enthalpy.
- Check barometric or powered relief is included and sized for the economizer airflow.
- Check fault detection is listed in the controller options when the spec or code requires it.
Refrigerant and the A2L transition
The U.S. EPA’s Technology Transitions rule under the AIM Act limits the global warming potential of refrigerants in new air conditioning and heat pump systems. For most packaged rooftop equipment that has meant moving from R-410A to A2L refrigerants such as R-454B and R-32. A spec written before the change may still name R-410A. A submittal with a different refrigerant from the spec is a deviation and must be called out, and A2L units can carry extra requirements for refrigerant detection and mitigation in the installation instructions.
Why RTU submittals are returned
| Reason | How to avoid it |
|---|---|
| Capacity shown only at AHRI conditions | Include a printout at the scheduled design conditions |
| Airflow at the wrong static pressure | Select the fan at the scheduled external static plus accessory losses |
| Missing economizer or fault detection | Check the energy code and the spec’s controls paragraph |
| Refrigerant differs from the spec | List it as a deviation and attach the installation requirements |
| Curb does not match the existing curb on a replacement | Include the adapter curb drawing |
| Options listed but not on the model number | Decode the model number against the options list |
Where Cailar fits
What Cailar does
- Reads capacity, airflow, static pressure, efficiency and electrical data from the submittal and compares each with the schedule, converting CFM, in. wg, MBH and tons in code.
- Flags a capacity below the scheduled value, or a value the submittal does not state, with both pages cited.
- Keeps each deviation, such as a different refrigerant, on the deviation log in the issued package.
What stays with your reviewer
- Run equipment selections or correct capacity for altitude or ambient. The rep’s selection printout supplies those values.
- Check structural capacity for the unit and curb.
Questions and answers
What is Section 23 74 16.13?
It is the MasterSpec section for large-capacity packaged rooftop air-conditioning units, under MasterFormat Section 23 74 16. Small-capacity units are in 23 74 16.11. The cutoff between them is defined in the section.
Why does the rooftop unit capacity differ from the AHRI rating?
AHRI 340/360 rates units at 95 °F outdoor and 80/67 °F entering air. At a hotter design ambient or with more outside air, actual capacity changes. The submittal should include a selection printout at the project’s scheduled conditions.
What is IEER on a rooftop unit?
Integrated energy efficiency ratio is a weighted average of efficiency at 100, 75, 50 and 25 percent load under AHRI 340/360. Energy codes set minimum IEER and EER values by size and heating type for commercial packaged units.
Does a rooftop unit need an economizer?
In most climate zones, ASHRAE 90.1 and the IECC require an air economizer on cooling systems above a capacity threshold, with exceptions. Newer editions also require economizer fault detection. Check the energy code edition adopted for the project.
Is R-454B acceptable if the spec says R-410A?
Only if the engineer accepts it. A refrigerant different from the spec is a deviation that must be identified in writing. Many specs written before the refrigerant transition are being updated to allow A2L refrigerants such as R-454B and R-32.
Sources
Standards and codes this page relies on. Check the edition your project and jurisdiction have adopted.
- AHRI Standard 340/360, Commercial and Industrial Unitary Air-conditioning and Heat Pump Equipment
- ASHRAE Standard 90.1, Energy Standard for Sites and Buildings
- U.S. EPA, Technology Transitions rule under the AIM Act (40 CFR Part 84)
- UL 60335-2-40, safety of heat pumps and air conditioners, including A2L refrigerant provisions