Section 23 74 16.13 Packaged Rooftop Air-Conditioning Units: reviewing an RTU submittal

How to review a rooftop unit submittal: capacity at the project’s design conditions, IEER, fan static, economizer, refrigerant, curb and electrical data.

Illustration: a rooftop unit submittal whose cooling capacity at the project’s 105 °F design ambient falls short of the schedule, while airflow and IEER match and economizer fault detection is not stated.

Illustrative example

The short answer

Section 23 74 16.13 covers large packaged rooftop units. A complete RTU submittal shows cooling capacity at the project’s design ambient and entering air conditions rather than only the AHRI rating point, efficiency in EER and IEER, supply airflow at the scheduled external static pressure, the heating section, economizer and outside air controls, refrigerant, curb, weight and electrical data for the voltage supplied.

MasterFormat division
23, HVAC
Rating standard
AHRI 340/360 for 65,000 Btu/h and larger
Rating point
95 °F outdoor, 80 °F dry bulb and 67 °F wet bulb entering
Coordinate with
Structural curb and framing, Division 26 power, 23 09 23 controls

What the section covers

Packaged rooftop units combine the compressor, condenser, evaporator, supply fan and heating section in one cabinet set on a roof curb. MasterSpec splits them into small-capacity units in 23 74 16.11 and large-capacity units in 23 74 16.13, with the cutoff defined in the section. Dedicated outdoor air units and custom air handlers are elsewhere in Division 23, so check the section number on the cover before reviewing anything else.

The schedule on the mechanical drawings carries most of the requirements: capacity at stated conditions, airflow and external static pressure, outside air, heating input or kW, efficiency, electrical data, weight and options. The section adds construction, controls, warranties and testing.

Capacity at the project’s conditions, not the rating point

AHRI 340/360 ratings are measured at 95 °F outdoor air and 80 °F dry bulb, 67 °F wet bulb entering air. A unit installed in Phoenix, Las Vegas or Dallas sees a hotter design day, and a unit with a lot of outside air sees warmer, wetter entering air. Capacity at those conditions can be several percent lower. The schedule should state its conditions; the submittal must show a performance printout at them.

Worked example: rated capacity versus design capacity
AHRI rated total capacity at 95 °F
362 MBH
Scheduled design ambient
105 °F
Scheduled total capacity at design
345 MBH
Submitted capacity at 105 °F (performance printout)
334 MBH
Shortfall
11 MBH, about 3 percent
Sensible capacity
Check separately: latent-heavy loads hide sensible shortfalls

If the rep only included the AHRI certificate, the shortfall is invisible. Ask for the selection printout at the scheduled ambient and entering air conditions.

Values to check on every RTU

Rooftop unit review checklist
ValueSource of the requirementCommon problem
Total and sensible coolingScheduleOnly rated capacity shown; sensible not stated
Supply airflow and external static pressureScheduleAirflow shown at a lower static pressure than scheduled
Outside air and economizerSchedule, energy codeNo economizer where the code requires one, or no fault detection
EER and IEEREnergy code, specEfficiency from a different size or voltage
Heating input, output or kWScheduleGas output given where input was scheduled, or the reverse
Heat exchanger materialSpecAluminized steel where stainless is required
RefrigerantSpecR-410A or R-454B against the specified refrigerant
FiltersSpecTwo-inch MERV 8 where MERV 13 is required
CurbSpec, structuralCurb height, wind or seismic rating, or adapter for an existing curb missing
Operating weightStructuralWeight with options and curb not given
Electrical dataSchedule, panel scheduleData for another voltage; see voltage mismatches
MCA, MOP and disconnectPanel scheduleBreaker above MOP; see MCA and MOP
Controls interface23 09 23No BACnet interface where the building automation system needs one
Convenience outletSpecUnit-powered outlet where field-powered is required, or none

Economizers and outside air

ASHRAE 90.1 and the IECC require air economizers on cooling systems above a size threshold in most climate zones, and newer editions require fault detection and diagnostics on economizers so a stuck damper is reported. California Title 24 has its own requirements. The spec usually states the control sequence, the type of high-limit control and whether fault detection is required.

  • Check the minimum outside air setting against the ventilation schedule, in CFM.
  • Check the high-limit control type the spec names: fixed dry bulb, differential dry bulb or enthalpy.
  • Check barometric or powered relief is included and sized for the economizer airflow.
  • Check fault detection is listed in the controller options when the spec or code requires it.

Refrigerant and the A2L transition

The U.S. EPA’s Technology Transitions rule under the AIM Act limits the global warming potential of refrigerants in new air conditioning and heat pump systems. For most packaged rooftop equipment that has meant moving from R-410A to A2L refrigerants such as R-454B and R-32. A spec written before the change may still name R-410A. A submittal with a different refrigerant from the spec is a deviation and must be called out, and A2L units can carry extra requirements for refrigerant detection and mitigation in the installation instructions.

Why RTU submittals are returned

Common rejection reasons
ReasonHow to avoid it
Capacity shown only at AHRI conditionsInclude a printout at the scheduled design conditions
Airflow at the wrong static pressureSelect the fan at the scheduled external static plus accessory losses
Missing economizer or fault detectionCheck the energy code and the spec’s controls paragraph
Refrigerant differs from the specList it as a deviation and attach the installation requirements
Curb does not match the existing curb on a replacementInclude the adapter curb drawing
Options listed but not on the model numberDecode the model number against the options list

Where Cailar fits

What Cailar does

  • Reads capacity, airflow, static pressure, efficiency and electrical data from the submittal and compares each with the schedule, converting CFM, in. wg, MBH and tons in code.
  • Flags a capacity below the scheduled value, or a value the submittal does not state, with both pages cited.
  • Keeps each deviation, such as a different refrigerant, on the deviation log in the issued package.

What stays with your reviewer

  • Run equipment selections or correct capacity for altitude or ambient. The rep’s selection printout supplies those values.
  • Check structural capacity for the unit and curb.

Questions and answers

What is Section 23 74 16.13?

It is the MasterSpec section for large-capacity packaged rooftop air-conditioning units, under MasterFormat Section 23 74 16. Small-capacity units are in 23 74 16.11. The cutoff between them is defined in the section.

Why does the rooftop unit capacity differ from the AHRI rating?

AHRI 340/360 rates units at 95 °F outdoor and 80/67 °F entering air. At a hotter design ambient or with more outside air, actual capacity changes. The submittal should include a selection printout at the project’s scheduled conditions.

What is IEER on a rooftop unit?

Integrated energy efficiency ratio is a weighted average of efficiency at 100, 75, 50 and 25 percent load under AHRI 340/360. Energy codes set minimum IEER and EER values by size and heating type for commercial packaged units.

Does a rooftop unit need an economizer?

In most climate zones, ASHRAE 90.1 and the IECC require an air economizer on cooling systems above a capacity threshold, with exceptions. Newer editions also require economizer fault detection. Check the energy code edition adopted for the project.

Is R-454B acceptable if the spec says R-410A?

Only if the engineer accepts it. A refrigerant different from the spec is a deviation that must be identified in writing. Many specs written before the refrigerant transition are being updated to allow A2L refrigerants such as R-454B and R-32.

Sources

Standards and codes this page relies on. Check the edition your project and jurisdiction have adopted.

Bring us one submittal.

Send us one submittal and its spec section. We run the review with you, and you keep the report.

Run a pilot