Section 26 24 16 Panelboards: ratings, breakers and fault current on the submittal

Reviewing panelboard submittals: voltage, bus and main ratings, interrupting rating against available fault current, series ratings, breaker types and spaces.

Illustration: a 480 V panelboard submittal whose branch breakers are rated below the available fault current, with one breaker larger than the rooftop unit’s maximum overcurrent protection and fewer spare spaces than specified.

Illustrative example

The short answer

Section 26 24 16 covers lighting and appliance panelboards and power distribution panelboards. Check each panel’s voltage, phase and wires, bus ampacity, main breaker or main lugs, interrupting or short-circuit rating against the available fault current, whether that rating is full or series, every branch breaker’s size, poles and type against the panel schedule and the equipment it feeds, spaces, enclosure and options such as surge protection.

MasterFormat division
26, Electrical
Product standards
UL 67 panelboards, UL 489 molded-case breakers
Fault current rules
NEC 110.9, 110.10, 110.24 and 240.86 series ratings
Coordinate with
26 05 73 power system studies, Division 23 nameplates, panel schedules

What Section 26 24 16 covers

Panelboards distribute power to branch circuits: lighting and receptacles at 120/208 V, lighting and mechanical loads at 480Y/277 V, and larger feeders in distribution panels. Switchboards are in 26 24 13 and motor control centers in 26 24 19. The panelboard submittal is usually a set of drawings, one per panel, showing the bus, main, every breaker and the nameplate ratings. It is the electrical submittal most tied to the mechanical one, because every HVAC unit’s breaker lives on it.

Interrupting rating and available fault current

Every breaker must be able to interrupt the largest fault current available at its location without failing. NEC 110.9 requires equipment intended to interrupt current to have an interrupting rating at least equal to the available fault current, and NEC 110.10 extends the idea to the whole circuit. The available fault current comes from the short-circuit study under Section 26 05 73, or from the engineer’s calculation on the one-line diagram.

Two ways to meet the fault current
ApproachHow it worksWhat the submittal must show
Fully ratedEvery breaker in the panel is rated for the available fault currentInterrupting rating of the main and every branch breaker
Series ratedBranch breakers rated lower are protected by a specific upstream device tested with themThe tested combination, its rating, and the label required by NEC 240.86
Series ratings are only valid for combinations tested and listed together, and usually not where motor contribution is significant. The spec may prohibit them.
Worked example: what rating does Panel H2 need?
Available fault current at H2 (study)
28 kA
Branch breakers submitted
18 kA
Next standard rating
35 kA
Series option
Only with a tested combination with the feeder breaker upstream

If the study has not been done yet, submit with the ratings on the one-line diagram and flag the panel for confirmation. A study issued later can change the answer.

Branch breakers against the equipment they feed

Check every breaker that feeds mechanical equipment against that equipment’s nameplate data. This is the point where Division 23 and Division 26 meet.

  • Breaker size at or below the equipment’s maximum overcurrent protection; see MCA and MOP.
  • Breaker type: HACR-rated for air-conditioning equipment whose nameplate allows breakers; fuses where the nameplate says fuse only.
  • Poles and voltage match the equipment: a 3-pole breaker for 460/3/60, a 2-pole 208 V breaker for single-phase 208 V equipment; see voltage mismatches.
  • GFCI breakers where the code requires ground-fault protection, such as many outdoor and rooftop receptacles and some equipment circuits.
  • Shunt trip, SWD (switching duty) or other accessories the panel schedule calls for.

Panel ratings and construction

Panelboard values to check
ValueCommon problem
Voltage, phase and wires120/240 V single-phase panel submitted for a 120/208 V three-phase system
Bus ampacity and materialAluminum bus where copper is specified
Main breaker or main lugs onlyMain lugs submitted where a main breaker is scheduled
Neutral ratingStandard neutral where a 200 percent neutral is required for nonlinear loads
Spaces and sparesFewer spaces than the spec’s spare percentage
Enclosure type and mountingNEMA 1 surface panel where NEMA 3R or flush is scheduled
Door constructionSingle door where door-in-door is specified
Integral surge protectionMissing where the schedule calls for it
Feed-through or sub-feed lugsMissing for a panel that feeds another

When the mechanical submittals change

Panelboards are often submitted before the mechanical equipment is approved, using the electrical engineer’s assumed loads. When the approved rooftop units, pumps or fans arrive with different horsepower, MCA or MOP, the breakers on the approved panel no longer match. This is one of the most common causes of field changes to new panels.

  1. Hold the mechanical breakers

    Mark the breakers that feed Division 23 equipment as subject to confirmation on the panel submittal, so the electrical engineer expects a revision.

  2. Compare after each mechanical approval

    When an equipment submittal is approved, compare its electrical data with its circuit on the panel schedule: voltage, poles, breaker size against MOP, conductor size against MCA.

  3. Revise before release

    Send the breaker changes before the panels are released for manufacture. A breaker swap at the factory is cheap; a field change after installation is not.

Why panelboard submittals are returned

Common rejection reasons
ReasonHow to avoid it
Interrupting rating below available fault currentUse the study or one-line values for every panel
Series rating without a tested combinationShow the listed combination or submit fully rated
Breaker above equipment MOPCheck every mechanical breaker against the approved equipment submittal
Wrong voltage or configurationConfirm voltage, phase and wires against the one-line
Spare spaces below specCount spaces after all scheduled circuits
Options missingCheck door, SPD, neutral and lugs against the schedule

Where Cailar fits

What Cailar does

  • Compares breaker sizes a reviewer enters from the panel schedule with the MCA and MOP on the approved equipment submittals, and flags a breaker above MOP or below MCA.
  • Compares panel voltage, phase and kA ratings with the requirement, converting kA in code, and flags a rating below it.

What stays with your reviewer

  • Perform short-circuit, coordination or arc flash studies.
  • Verify series-rated combinations against the manufacturer’s tested tables.

Questions and answers

What does Section 26 24 16 cover?

Panelboards: lighting and appliance branch-circuit panelboards and power distribution panelboards, including their bus, mains, branch breakers, enclosures and accessories.

What is the difference between fully rated and series rated panelboards?

In a fully rated panel every breaker can interrupt the available fault current on its own. In a series-rated system, lower-rated branch breakers rely on a specific upstream device, tested and listed together, to interrupt high faults. NEC 240.86 requires series ratings to be tested and labeled.

Where do I find the available fault current for a panel?

From the short-circuit study under Section 26 05 73 or from the engineer’s values on the one-line diagram. NEC 110.24 also requires service equipment in many buildings to be marked with the available fault current.

Can a panel breaker be larger than the HVAC unit’s MOP?

No. The breaker or fuse must not exceed the maximum overcurrent protection marked on the equipment nameplate. A larger breaker violates the listing and NEC Article 440.

What is a 200 percent neutral?

A neutral bus rated at twice the phase bus ampacity, used where nonlinear loads such as electronic equipment create harmonic currents that add up on the neutral. Specs call for it on panels serving those loads.

Sources

Standards and codes this page relies on. Check the edition your project and jurisdiction have adopted.

Bring us one submittal.

Send us one submittal and its spec section. We run the review with you, and you keep the report.

Run a pilot