How-to guides for MEP submittals and buyout
Step-by-step methods for the routine work around submittals, from the register to the closeout binder.
How to build an MEP submittal register from the spec bookA step-by-step method for turning Division 21 to 26 spec sections into a submittal register, with columns, a numbering scheme and back-scheduled dates.How to check the mechanical schedule against the panel schedules, tag by tagA method for joining mechanical schedules with electrical panel schedules by tag to find voltage, phase, breaker, MCA and missing-circuit conflicts early.How to review a cut sheet against its spec section, value by valueA repeatable method for checking a cut sheet against the spec section and schedule: build the requirement list, find each value, read footnotes, convert units.How to write a deviation list for an MEP submittalWhat counts as a deviation, the columns a deviation list needs, how to word each entry so the engineer can act on it, and why “no deviations” is risky.
Bring us one submittal.
Send us one submittal and its spec section. We run the review with you, and you keep the report.
Run a pilot