MEP submittal and buyout terms, explained
The abbreviations and contract terms on MEP submittals and nameplates, each explained with an example from a real review.
Approved equal: what “or equal” allows and what the engineer will ask you to proveWhat “or approved equal” means in MEP specs, who decides equivalence, when it becomes a substitution, and how to build an equal comparison that gets approved.Basis of design: what it means in a spec and what it obliges an alternate to matchWhat a basis-of-design product is, how it differs from a named alternate, why alternates must match more than the scheduled ratings, and how to compare them.Buyout: turning the MEP estimate into purchase orders without losing scopeWhat buyout means for an MEP contractor, how it connects to submittals, how to level equipment quotes on the same scope, and what goes on the purchase order.Delegated design: when the contractor’s engineer designs part of the MEP workWhat delegated design means under AIA A201 § 3.12.10, the MEP work it usually covers, what a sealed submittal must contain, and what it costs in time.FLA, RLA and LRA: the three motor currents on an equipment nameplateWhat full-load amps, rated-load amps and locked-rotor amps mean, which NEC rules use each one, and how they show up on HVAC and pump submittals.MCA and MOP: minimum circuit ampacity and maximum overcurrent protectionWhat MCA and MOP mean on an HVAC nameplate, how manufacturers calculate them, how they size the wire and breaker, and what to check on a submittal.
Bring us one submittal.
Send us one submittal and its spec section. We run the review with you, and you keep the report.
Run a pilot